 | Moschee von Algier |
Dresden, Bautzner Str. 19C Special building construction
In the next few years the largest Mosque in the world after Mekka and Medina with space for over 100,000 believers will be built in the capital city of Algeria. The competition design from Gerd Prieb
|
 | Ägypten |
|
 | Möhlenhoff Wärmetechnik GmbH (aktuelles Projekt) |
Salzgitter Building expansion Commercial trade buildings Industrial Factory Administration
| Bauherr: Möhlenhoff Wärmetechnik GmbH | Headquarters extension | 1st place in an invitation only competition | Start of building: June 2008 | Completion (scheduled): July 2009 | Work stages: 1-8 |
|
 | Volksbank Arena Hamburg (2007/2008) |
Hamburg
| Builder: Alexander Otto Sportstiftung / HH | Represented by: ECE Projektmanagment G.m.b.H. & Co. KG / HH | Client: GU Eiffel Deutschland Stahltechnologie GmbH / H | Planning period: September 2007
|
 | 2 Burger King Restaurants in Odense / Dänemark (2007/2008) |
Odense
| Operator: Nicam Fast Food AS / Sønderborg | Planning period: November 2007 - May 2008 | Start of building: June/July 2008 | Completion: September/October 2008 | Work stages: 1-8 | In compliance wit
|
 | Konica Minolta Head Office Europe / Langenhagen (2007/2008) |
Hannover-Langenhagen
| Redesign of showroom area and new demo and test area in the store section | Client: Konica Minolta Business Solutions Europe GmbH |Planning period: August 2007 - February 2008 | Start of building:
|
 | Homberg (Efze) Marktplatz Hessentag |
Homberg (Efze) , Marktplatz Public parks and areas Structures Building of objects Space planning Urban Planning Transportation Facilities
|
 | Bürogebäude Siemens PG |
Mülheim an der Ruhr, Rheinstr. 100 Office Building
Office Buildings Siemens PG
Project Location: Mülheim an der Ruhr, Germany, Rheinstr. 100
Completion: 2002 Pictures: Frontal view Rheinstreet Side view A new office building was completed in 2002
|
 | Haus Balkenhol |
Mosbach Single family house Villa
Views and break-throughs Reduced architecture keeps dynamics and ease by the play with differently formed out and saliently placed opening elements. Life as in the loft was apart from privacy the se
|
 | ESPRIT - Headquarter Europe |
Ratingen, Esprit Allee Exhibition building Office Building
The ESPRIT Headquarters building was completed in 2003 and provides office space for approximately 600 workers of the different company divisions. The building complex consists of five independent an
|
 | Kö 24 - Abriss und Neubau eines Büro- und Geschäftshauses |
Düsseldorf, Königsallee 24 Office Building Commercial trade buildings
Jeweller BVLGARI Building Düsseldorf
When construction began in January 2005 on the renovation of a retail office building in Dusseldorf’s exclusive shopping district, the principal ground floor ten
|
 | Scuole Medie Negrelli (Secondary School Negrelli) |
Trento School
Demolition and Rebuilding of Secondary School Existing build was torn down for a completely new conception of a school building in accordance with the principles of bio-building and recovery of natur
|
 | Toyota Tower |
Dubai Commercial trade buildings
Interior Design Architecture Competition
An architectural competition for the interior design of the Toyota tower to be located in Dubai. The design cover all public and office areas, as well as the
|
 | Hauptbahnhof Berlin / Lehrter Bahnhof |
Berlin Train and Subway Stations Transportation Facilities
Main Train Station -Berlin, Germany
Since the 90's, the city of Berlin, the Federal Republic of Germany and the Deutscher Bahn have been busy planning a future oriented rail infrastructure. The main
|
 | FrankfurtHochVier |
Frankfurt, Zeil Shopping Center Leisure structure Restaurant catering Commercial trade buildings Urban Planning
The Business Centre "an der Zeil" in Frankfurt is spanned by a freely formed steel and glass roof covering a total area of approx. 12000m². By dissolving the free forming surface in triangle meshes a
|
 | Wohn- und Geschäftshaus Mainz |
Mainz Commercial trade buildings Multi-family housing Housing development
The six storey building is covered with a glass-ceramic façade. In front of the loggias, powered folding panels can be moved upwards. From the atrium roof, 20m high GRP columns will be suspended and
|
 | Whitecity, London |
London Shopping Center Leisure structure Restaurant catering Commercial trade buildings
We were appointed by the company Seele to plan and detail a 17,000 m² free-formed glass roof and 5,000 m² vertical glass façade for a mall in London. Based on the architect’s preliminary draft, we o
|
 | Fassaden Flughafen Dubai |
Dubai, United Arab Emirates Special building construction Transportation Facilities
For the construction of a terminal at Dubai International Airport we are working on the conceptual and detailed design of a tension wall facade system by order of the company Gartner. The 600m long t
|
 | 55 Baker Street, London |
London Shopping Center Restaurant catering Commercial trade buildings
The 55 Baker Street building was originally designed in the Fifties as an 8-storey-high concrete-structure. Now a complete refurbishment is being undertaken. Three dominating folded glass facades wit
|
 | Erweiterung der Plaza-Halle für E.ON, München |
München Office Building Conference Building
E.ON AG has expanded its headquarter in Munich. As an addition to the existing roofing of the plaza we planned a glass roof of 18 x 18m and a facade as a turnable 8.5m wide and 20m high gate. Its ste
|