Collaboration par excellence

Example: Hasselt City Hall, Belgium — The building of the new municipal administration center in Hasselt, Belgium, demonstrates how seamless collaboration in building projects can minimize risks and save costs from the design phase all the way to commissioning.
A joint project of several brands of the Nemetschek Group.
Nemetschek brands involved: Allplan, GRAPHISOFT, Solibri

Pioneering planning and project execution with Open BIM

“The end-to-end use of BIM solutions constitutes genuine added value for all stakeholders in the building process
because it enables seamless and efficient collboration”

Steven Hendrickx, Head Architect in Hasselt

Large-scale, highly complex building projects in particular require ongoing, reliable and efficient coodination between all stakeholders – both internal and external – across disciplines and between companies. Therefore, in association with other market players, the Nemetschek Group is promoting the Open BIM data standard. This is a universal, collaborative approach to designing, constructing and operating buildings based on open standards and workflows It makes it possible for project stakeholders to collaborate, even if the type of software varies from user to user. The Industry Foundation Classes (IFC) interface has established itself as an open standard and is therefore of central significance.

Sharing and evaluating data throughout the entire product life cycle saves time and money and improves quality. The administration of data is key to this digital transformation, for it is only possible to take full advantage of the potential if each stakeholder can access the data that he or she needs at any given time. This begins with a realistic BIM building model, which is an essential prerequisite for a genuine 5D workflo. This model is no longer limited to just 3D construction data; it also includes data concerning the dimensions of time and costs.

Seamless collaboration exemplified by the Hasselt City Hall

Under the management of the architect team comprising Jaspers-Eyers, MASS Architects and Michel Janssen, a new municipal administration center is being built in Hasselt. The complex, consisting of a renovated building section and a new building, provides approx. 17,000 m2 for the city administration and social services as well as offices. The architects and their most important partners are using Open BIM software solutions for the entire construction process. Three Nemetschek solutions are being implemented for this project: Archicad from Graphisoft for the design and planning of the architects, Allplan Engineering for civil engineering, and the Solibri Model Checker for the BIM quality control carried out by the construction company.

From the beginning, all information concerning the building project is contained in the digital building model – from the draft to implementation – including all design details, desired materials, fire protection requirements, acoustic properties, insulation and building structures, and administration. This constitutes considerable added value for all stakeholders compared to the old standard model, which was purely 3D. Thus, this improvement ensures more than just seamless collaboration between all those involved. The complex project can be turned over to the municipality – the proud building owner – with the required quality, on time and within the specified budget.

Hasselt City Hall is groundbreaking – in terms of design, planning and project implementation.

Independent and yet consistent

Steven Hendrickx, the head architect in Hasselt, recognized four decisive factors with Open BIM over the course of the successful project:

  • Individual partners design their model with their preferred BIM software, and with their own templates. Outstanding collaboration is ensured, though, thanks to a common, uniform standard which is specified in advance.
  • The division of labor is defined at the beginning of the project. Data on statics, for instance, have an essential impact on the architecture and structural design. Data on heating, ventilation and air-conditioning, on the other hand, are also important but don’t generally flow directly into the architecture. These data, for example, can be sufficiently analyzed with the BIM solution for quality assurance from Solibri.
  • Design changes in one area don’t necessarily affect the plans of all the others involved in the project. The architecture and the building stage are inherently the most closely linked.
  • The expertise of the staff, i.e., extensive holistic knowledge of the various building disciplines, is also critical for the success of the project.

Two examples of the advantage of precise planning

In Hasselt, the construction company was commissioned with excavation, among other tasks. An assessment of the amount of sand that needed to be removed was done based on a cal culation using conventional 2D planning methods, which yielded a result of 800 cubic meters. The engineers used the Solibri Model Checker based on Open BIM and the data provided by the architects and arrived at a figue that was just half this amount, i.e., 400 cubic meters of sand. This shows how exact the work with Open BIM solutions can be.

The steel struts to be installed are another example: With the interface function IFC Exports from Allplan, it was possible to use the BIM model to automatically calculate which steel struts needed fieproofing. All it took was a mouse click to obtain precise results, right down to the running meter. In projects that don’t use Open BIM solutions, these calculations are made by manually entering the data from 2D drawings in Excel or some other software and then recalculating and evaluating the data for use in quotations and planning, a process that is susceptible to error and one that leaves a lot of room for interpretation. These errors often go undetected until the actual cost planning is already completed. In the case of the Hasselt City Hall,  it was possible to avoid such errors from the outset.

Converting to Open BIM pays off

As is the case with any change, it takes a certain amount of time for companies and employees to accept BIM as the norm. The best way, according to Steven Hendrickx, is to start out by planning smaller projects using BIM. The experience thereby gained will make it possible to complete successively larger BIM projects. The advantages of collaborating through Open BIM are obvious: The entire workflow is much simpler for all project stakeholders, and building projects are completed within time and cost budgets.

CONCLUSION

Consistent standards and open interfaces in par-ticular are essential for successful building projects. Stakeholders need solutions that can “work together” for all and any individual tasks being performed. Seamless collaboration between humans and machines: This is ensured with Open BIM, and backed by the brands of the Nemetschek Group.



Reference projects on this topic:

MAXON Announces Cinema 4D Release 17

Groundbreaking Innovation Optimizes Workflow and Elevates 3D Content Creation Experiences

Friedrichsdorf, August 4, 2015 – MAXON today announced Cinema 4D Release 17 (R17), a milestone release of its cornerstone 3D animation, graphics, VFX, visualization, and rendering software. Cinema 4D R17 delivers new, expanded and completely reworked features for exceptional performance allowing creatives to more easily and efficiently manage and create outstanding content. Central to Cinema 4D R17 is the new Take System that provides complete and flexible scene handling to manage render layers and animation variations. Also included are new Lens Distortion tools for improved motion tracking, and completely reworked Spline Tools for a more efficient workflow for manipulating points, lines, tangents, arcs and more.

“MAXON is committed to enriching user experience and productivity,” says Harald Egel, managing partner at MAXON Computer GmbH, “The robust new features and subtle refinements throughout Cinema 4D R17 make this a must-have release.”

Cinema 4D R17 Feature Highlights

At SIGGRAPH 2015 in Los Angeles, August 11 – 13, MAXON will preview the new features in R17. Key highlights include:

Take System: Provides new functionality and flexible scene management allowing artists to create numerous independent takes of a scene and change almost any parameter for variations – all saved in a single scene file, eliminating file management hassles and wasted disk space. The ability to maintain complete versioning and variation control also saves valuable production time.

Lens Distortion Support: Easily generate a distortion profile for any image, e.g., for curved and plunging lines when integrating 3D elements into videos or photos. The intuitive interface also improves functionality to remove distortion for tracking and scene creation, re-apply distortion at render time and offers the option of saving lens settings for future use.

Graph View for Motion Tracker: R17 has a new Graph View that highlights problem track points in a simple-to-use graph and lets users easily remove them from the calculation for improved efficiency.

New Spline Tools: The completely reworked Spline Tools in R17 provide artists with added control for manipulating points, lines, tangents and arcs more intuitively. Users can leverage Boolean operators like Intersect, Subtract, Union, And, Or for an even faster workflow.

Animation Workflow Enhancements: Cinema 4D R17 makes animation faster and more precise. Control F-Curves with weighted tangents with the option of automatically removing overshoot, eliminate Gimbal lock with Euler filtering, and define animation regions using range markers and master animation workflow with new Timeline preferences.

Sculpting Improvements: MAXON introduces dozens of new features in R17 to sculpt with precision and ease. The Sculpt to Pose Morph feature automatically creates morph targets for each sculpt layer, for a quick transition from character design to character animation. The new Edge Detection feature is designed to let users easily sculpt hard-surface models.

Houdini Engine Integration: A seamless integration for Side Effect Software’s Houdini Engine lets users load Houdini Digital Assets (HDA) such as parametric objects, simulations, etc., into Cinema 4D and manipulate them like standard Cinema 4D generators.

SketchUp Integration: Tighter integration in R17 with SketchUp – a 3D modeling program for a wide range of drawing applications – lets creative professionals quickly populate scenes by accessing free, ready-to-use objects created and made available by the SketchUp user community.

Cinema 4D R17 Pricing, Availability and Upgrade Path

Cinema 4D Release 17 is scheduled to ship September 2015. Pricing and upgrade information is available at www.maxon.net. Available for both Mac OS X and Windows.
Recommended system requirements.
All trademarks contained herein are the property of their respective owners.