Collaboration par excellence

Example: Hasselt City Hall, Belgium — The building of the new municipal administration center in Hasselt, Belgium, demonstrates how seamless collaboration in building projects can minimize risks and save costs from the design phase all the way to commissioning.
A joint project of several brands of the Nemetschek Group.
Nemetschek brands involved: Allplan, GRAPHISOFT, Solibri

Pioneering planning and project execution with Open BIM

“The end-to-end use of BIM solutions constitutes genuine added value for all stakeholders in the building process
because it enables seamless and efficient collboration”

Steven Hendrickx, Head Architect in Hasselt

Large-scale, highly complex building projects in particular require ongoing, reliable and efficient coodination between all stakeholders – both internal and external – across disciplines and between companies. Therefore, in association with other market players, the Nemetschek Group is promoting the Open BIM data standard. This is a universal, collaborative approach to designing, constructing and operating buildings based on open standards and workflows It makes it possible for project stakeholders to collaborate, even if the type of software varies from user to user. The Industry Foundation Classes (IFC) interface has established itself as an open standard and is therefore of central significance.

Sharing and evaluating data throughout the entire product life cycle saves time and money and improves quality. The administration of data is key to this digital transformation, for it is only possible to take full advantage of the potential if each stakeholder can access the data that he or she needs at any given time. This begins with a realistic BIM building model, which is an essential prerequisite for a genuine 5D workflo. This model is no longer limited to just 3D construction data; it also includes data concerning the dimensions of time and costs.

Seamless collaboration exemplified by the Hasselt City Hall

Under the management of the architect team comprising Jaspers-Eyers, MASS Architects and Michel Janssen, a new municipal administration center is being built in Hasselt. The complex, consisting of a renovated building section and a new building, provides approx. 17,000 m2 for the city administration and social services as well as offices. The architects and their most important partners are using Open BIM software solutions for the entire construction process. Three Nemetschek solutions are being implemented for this project: Archicad from Graphisoft for the design and planning of the architects, Allplan Engineering for civil engineering, and the Solibri Model Checker for the BIM quality control carried out by the construction company.

From the beginning, all information concerning the building project is contained in the digital building model – from the draft to implementation – including all design details, desired materials, fire protection requirements, acoustic properties, insulation and building structures, and administration. This constitutes considerable added value for all stakeholders compared to the old standard model, which was purely 3D. Thus, this improvement ensures more than just seamless collaboration between all those involved. The complex project can be turned over to the municipality – the proud building owner – with the required quality, on time and within the specified budget.

Hasselt City Hall is groundbreaking – in terms of design, planning and project implementation.

Independent and yet consistent

Steven Hendrickx, the head architect in Hasselt, recognized four decisive factors with Open BIM over the course of the successful project:

  • Individual partners design their model with their preferred BIM software, and with their own templates. Outstanding collaboration is ensured, though, thanks to a common, uniform standard which is specified in advance.
  • The division of labor is defined at the beginning of the project. Data on statics, for instance, have an essential impact on the architecture and structural design. Data on heating, ventilation and air-conditioning, on the other hand, are also important but don’t generally flow directly into the architecture. These data, for example, can be sufficiently analyzed with the BIM solution for quality assurance from Solibri.
  • Design changes in one area don’t necessarily affect the plans of all the others involved in the project. The architecture and the building stage are inherently the most closely linked.
  • The expertise of the staff, i.e., extensive holistic knowledge of the various building disciplines, is also critical for the success of the project.

Two examples of the advantage of precise planning

In Hasselt, the construction company was commissioned with excavation, among other tasks. An assessment of the amount of sand that needed to be removed was done based on a cal culation using conventional 2D planning methods, which yielded a result of 800 cubic meters. The engineers used the Solibri Model Checker based on Open BIM and the data provided by the architects and arrived at a figue that was just half this amount, i.e., 400 cubic meters of sand. This shows how exact the work with Open BIM solutions can be.

The steel struts to be installed are another example: With the interface function IFC Exports from Allplan, it was possible to use the BIM model to automatically calculate which steel struts needed fieproofing. All it took was a mouse click to obtain precise results, right down to the running meter. In projects that don’t use Open BIM solutions, these calculations are made by manually entering the data from 2D drawings in Excel or some other software and then recalculating and evaluating the data for use in quotations and planning, a process that is susceptible to error and one that leaves a lot of room for interpretation. These errors often go undetected until the actual cost planning is already completed. In the case of the Hasselt City Hall,  it was possible to avoid such errors from the outset.

Converting to Open BIM pays off

As is the case with any change, it takes a certain amount of time for companies and employees to accept BIM as the norm. The best way, according to Steven Hendrickx, is to start out by planning smaller projects using BIM. The experience thereby gained will make it possible to complete successively larger BIM projects. The advantages of collaborating through Open BIM are obvious: The entire workflow is much simpler for all project stakeholders, and building projects are completed within time and cost budgets.

CONCLUSION

Consistent standards and open interfaces in par-ticular are essential for successful building projects. Stakeholders need solutions that can “work together” for all and any individual tasks being performed. Seamless collaboration between humans and machines: This is ensured with Open BIM, and backed by the brands of the Nemetschek Group.



Reference projects on this topic:

MAXON Announces Cineware 2.0 and Cinema 4D Lite Release 16 Included with the Latest version of Adobe After Effects CC

Enhancements Include Improvements to Interactivity, Workflow and Compatibility with Recently Released Cinema 4D R16

Friedrichdorf, October 9, 2014 – MAXON, the leading developer of professional 3D modeling, painting, animation and rendering solutions, today announced MAXON Cineware 2.0 and Cinema 4D Lite Release 16, now available in the latest version of Adobe After Effects CC (2014.1). The upgrades symbolize the ongoing strategic relationship between MAXON and Adobe to deliver improved integration and performance between MAXON’s powerful 3D application, Cinema 4D, and Adobe’s industry-leading software. The new updates to the Cineware workflow, available in the Fall release of After Effects CC 2014, are designed to optimize performance and enhance creative capabilities.

With After Effects CC, creative professionals benefit from the seamless integration provided by Cineware that establishes a direct connection between Cinema 4D and After Effects. Users can open, edit and enhance Cinema 4D project files inside After Effects using the Live 3D pipeline first introduced last year in After Effects CC. Even compositing passes can be selected, edited and enhanced directly in After Effects. A lite yet feature-rich version of Cinema 4D, called Cinema 4D Lite, is included in After Effects CC.

Cineware Enhancements:

  • Cinema 4D Release 16 Compatibility: Last month, MAXON introduced Cinema 4D Release 16 (R16) marked by powerful enhancements to modeling, reflections and rendering. Cineware 2.0 offers compatibility with the commercial versions of Cinema 4D. Additionally, access to many of the new features in R16 including new multi-layered reflections are now available within Cinema 4D Lite R16 as part of the Fall 2014 release of After Effects CC.
  • Purge Memory: In order to improve performance and interactivity, an internal cache is used to store render data when using a Release 16 version of Cinema 4D as the render engine. The Purge Memory button frees cached data so that it can be used for RAM previews within After Effects.
  • Default Layer: The Cinema 4D layers dialog box now shows a Default Layer option if the renderer supports it. Objects that have not been assigned to an explicit layer in the .c4d project file can be isolated by choosing the Default Layer in After Effects.
  • Automatic Synchronization: When adding multiple instances of a Cinema 4D scene in a composition, a new Synchronize Layer checkbox at the top of the Effect Controls panel enables artists to automatically synchronize Cineware effect settings on all instances of the scene. If this checkbox is disabled for a specific Cineware layer, then that layer’s settings will not synchronize with the rest of the layers in that composition. This replaces having to utilize the “Apply To All” button from previous versions of Cineware.
  • Cinema 4D Content Browser: When rendering with a full retail version of Cinema 4D R16, textures included in Content Browser preset libraries will render correctly in After Effects.
  • Region of Interest: When utilizing the region of interest feature in After Effects to constrain the preview to a subset of the frame, the Cineware effect will now respect this setting and limit rendering to the area within the region of interest. [Note: This only applies when the Renderer is set to Standard (Final).]
  • Collect Files for Cinema 4D Assets: The Collect Files command in After Effects now collects assets associated with the Cinema 4D scene, such as textures.

Cinema 4D Upgrade Path

For After Effects CC users wishing to experience the more powerful features beyond Cinema 4D Lite, MAXON offers an attractive upgrade path to Cinema 4D Broadcast and Cinema 4D Studio for an even richer 3D content creation experience.