Collaboration par excellence

Example: Hasselt City Hall, Belgium — The building of the new municipal administration center in Hasselt, Belgium, demonstrates how seamless collaboration in building projects can minimize risks and save costs from the design phase all the way to commissioning.
A joint project of several brands of the Nemetschek Group.
Nemetschek brands involved: Allplan, GRAPHISOFT, Solibri

Pioneering planning and project execution with Open BIM

“The end-to-end use of BIM solutions constitutes genuine added value for all stakeholders in the building process
because it enables seamless and efficient collboration”

Steven Hendrickx, Head Architect in Hasselt

Large-scale, highly complex building projects in particular require ongoing, reliable and efficient coodination between all stakeholders – both internal and external – across disciplines and between companies. Therefore, in association with other market players, the Nemetschek Group is promoting the Open BIM data standard. This is a universal, collaborative approach to designing, constructing and operating buildings based on open standards and workflows It makes it possible for project stakeholders to collaborate, even if the type of software varies from user to user. The Industry Foundation Classes (IFC) interface has established itself as an open standard and is therefore of central significance.

Sharing and evaluating data throughout the entire product life cycle saves time and money and improves quality. The administration of data is key to this digital transformation, for it is only possible to take full advantage of the potential if each stakeholder can access the data that he or she needs at any given time. This begins with a realistic BIM building model, which is an essential prerequisite for a genuine 5D workflo. This model is no longer limited to just 3D construction data; it also includes data concerning the dimensions of time and costs.

Seamless collaboration exemplified by the Hasselt City Hall

Under the management of the architect team comprising Jaspers-Eyers, MASS Architects and Michel Janssen, a new municipal administration center is being built in Hasselt. The complex, consisting of a renovated building section and a new building, provides approx. 17,000 m2 for the city administration and social services as well as offices. The architects and their most important partners are using Open BIM software solutions for the entire construction process. Three Nemetschek solutions are being implemented for this project: Archicad from Graphisoft for the design and planning of the architects, Allplan Engineering for civil engineering, and the Solibri Model Checker for the BIM quality control carried out by the construction company.

From the beginning, all information concerning the building project is contained in the digital building model – from the draft to implementation – including all design details, desired materials, fire protection requirements, acoustic properties, insulation and building structures, and administration. This constitutes considerable added value for all stakeholders compared to the old standard model, which was purely 3D. Thus, this improvement ensures more than just seamless collaboration between all those involved. The complex project can be turned over to the municipality – the proud building owner – with the required quality, on time and within the specified budget.

Hasselt City Hall is groundbreaking – in terms of design, planning and project implementation.

Independent and yet consistent

Steven Hendrickx, the head architect in Hasselt, recognized four decisive factors with Open BIM over the course of the successful project:

  • Individual partners design their model with their preferred BIM software, and with their own templates. Outstanding collaboration is ensured, though, thanks to a common, uniform standard which is specified in advance.
  • The division of labor is defined at the beginning of the project. Data on statics, for instance, have an essential impact on the architecture and structural design. Data on heating, ventilation and air-conditioning, on the other hand, are also important but don’t generally flow directly into the architecture. These data, for example, can be sufficiently analyzed with the BIM solution for quality assurance from Solibri.
  • Design changes in one area don’t necessarily affect the plans of all the others involved in the project. The architecture and the building stage are inherently the most closely linked.
  • The expertise of the staff, i.e., extensive holistic knowledge of the various building disciplines, is also critical for the success of the project.

Two examples of the advantage of precise planning

In Hasselt, the construction company was commissioned with excavation, among other tasks. An assessment of the amount of sand that needed to be removed was done based on a cal culation using conventional 2D planning methods, which yielded a result of 800 cubic meters. The engineers used the Solibri Model Checker based on Open BIM and the data provided by the architects and arrived at a figue that was just half this amount, i.e., 400 cubic meters of sand. This shows how exact the work with Open BIM solutions can be.

The steel struts to be installed are another example: With the interface function IFC Exports from Allplan, it was possible to use the BIM model to automatically calculate which steel struts needed fieproofing. All it took was a mouse click to obtain precise results, right down to the running meter. In projects that don’t use Open BIM solutions, these calculations are made by manually entering the data from 2D drawings in Excel or some other software and then recalculating and evaluating the data for use in quotations and planning, a process that is susceptible to error and one that leaves a lot of room for interpretation. These errors often go undetected until the actual cost planning is already completed. In the case of the Hasselt City Hall,  it was possible to avoid such errors from the outset.

Converting to Open BIM pays off

As is the case with any change, it takes a certain amount of time for companies and employees to accept BIM as the norm. The best way, according to Steven Hendrickx, is to start out by planning smaller projects using BIM. The experience thereby gained will make it possible to complete successively larger BIM projects. The advantages of collaborating through Open BIM are obvious: The entire workflow is much simpler for all project stakeholders, and building projects are completed within time and cost budgets.

CONCLUSION

Consistent standards and open interfaces in par-ticular are essential for successful building projects. Stakeholders need solutions that can “work together” for all and any individual tasks being performed. Seamless collaboration between humans and machines: This is ensured with Open BIM, and backed by the brands of the Nemetschek Group.



Reference projects on this topic:

Maxon Announces Next Generation Cinema 4D Release 21 at Siggraph 2019

“3D for Whole World” Initiative Delivers Singular Version of Cinema 4D and New Subscription Pricing Options

Feature Updates and Broader Integration with Leading Technology Solutions Empower Creative Workflows for 3D Professionals

Friedrichsdorf, Germany, July 30, 2019 – Maxon today announced Cinema 4D Release 21 (R21), the next generation of its professional 3D modeling, animation, and rendering software solution. R21 introduces powerful new capabilities including a completely new Caps and Bevel system, new Field Force dynamics, interface speed enhancements and broader integration with popular hardware and software technologies. R21 also introduces Maxon’s “3D for the Whole World” initiative which aims to put professional 3D software within easy reach of every aspiring artist. This includes availability of a singular version of Cinema 4D, more efficient installation and licensing, and new low-entry subscription pricing.

Maxon CEO, David McGavran, explains “3D for the Real World” is not just Maxon’s slogan but the central way they approach the market and the development of its products. Cinema 4D has long been heralded as the high-end 3D content creation solution that empowers the creative process – easiest to learn and easiest to use. Today, “easiest to acquire” will be added to the software’s first-class reputation.

“With R21, we have overhauled virtually every aspect of how our customers choose, download, purchase, license and manage Cinema 4D,” says McGavran. “The availability of a unified version of Cinema 4D will allow us to focus on developing one amazing 3D solution. Very attractive subscription pricing options ensure users around the world can easily access the most up-to-date 3D technology.”

(Maxon will debut Cinema 4D R21 at SIGGRAPH 2019 taking place July 30 - August 1, 2019, at the Los Angeles Convention Center, Booth #1227)

Feature Highlights in R21

  • One Version of Cinema 4D/More Efficient Installation and Licensing – R21 marks the introduction of one singular version of Cinema 4D that includes the complete feature set at an affordable price. Customers no longer need to choose between editions of the software and will benefit from all feature updates as they become available. A new global online store allows users to subscribe and immediately activate licenses.
  • Caps and Bevel – The all-new Caps and Bevels system in R21 lets users extrude 3D logos and animate text effects – the ‘bread and butter’ of 3D motion graphics – quickly, easily and more accurately. But this feature offers more than just fancy fonts and text – caps and bevels are integrated on all spline-based objects – lathe, loft, sweep, etc. for unlimited possibilities. Enhancements include improved constraints and internal bevels, Delaunay cap skinning and a new library of bevel presets.
  • Field Forces – The new Field Force dynamics object in R21 allows users to optimize motion graphics workflow in the MoGraph toolset, offering flexibility and power to control dynamic forces in modeling and animation effects for optimized performance.
  • Mixamo Control Rig – Offering a quick and customizable way to implement character animation, the new Mixamo Control Rig gives R21 users the ability to adjust Mixamo animations imported into Cinema 4D for a flexible and powerful workflow.
  • Rendering Improvements – Cinema 4D's wide range of render options deliver fast, beautiful and professional results for creating outstanding images and animations. New capabilities in R21 include:
  • Intel® Open Image Denoise – R21 integrates Intel Open Image Denoise, a library for high-performance, easy-to-use denoising filter solution to improve visual quality and reduce rendering times via deep learning techniques. This technology is part of the Intel® oneAPI Rendering Toolkit, , a set of libraries to help create high-performance, high-fidelity, extensible, and cost-effective visual applications and solutions. The solution works and is available with Cinema 4D’s internal rendering solutions as well as ProRender.

Material Nodes – Numerous additional nodes and UI improvements to accelerate workflow include the new Node Space that defines which material nodes are available to the chosen renderer. Additionally, an API is now available for third-party developers to integrate render engines with the new material node system.

Workflow and Core Improvements

  • Interface Speed Enhancements – Interface speed augmentations increase performance in R21 for quicker modeling operations, particularly in demanding, fast-paced productions that require heavy keyframe scene creation.
  • Access to the Best Technology – R21 leverages the latest processor optimizations from Intel and AMD. Cinema 4D users can also directly import files to the Unreal Engine and Unity game engines to build stunning cinematic games, simulations, and visualizations. Integration into numerous other popular software packages also means artists have the necessary set of features for maximum creative flexibility.
  • Optimized Workflow – As Maxon continues to transition to a more modern UI in Cinema 4D, R21 features improved color, updated menus and defaults. Support for HiDPI on Windows and Mac, provide optimized, anti-aliased display on high end laptops and monitors, and more.

Complete feature set in Cinema 4D Release R21

Pricing, Availability / Upgrade Path
Cinema 4D R21 will be available on September 3, 2019 for both macOS and Windows.
Pricing and Distribution Information
Recommended System Requirements

Cinema 4D R21 Info:
Cinema 4D R21 Release Information
Cinema 4D R21 Press Material

About Maxon
Headquartered in Friedrichsdorf, Germany, Maxon Computer is a developer of professional 3D modeling, painting, animation and rendering solutions. Its award-winning Cinema 4D and Redshift 3D software products have been used extensively to help create and render everything from stunning visual effects in top feature films, TV shows and commercials, cutting-edge game cinematics for AAA games, as well as for medical illustration, architectural and industrial design applications. Maxon has offices in Germany, USA, United Kingdom, Canada, France, Japan and Singapore. Maxon products are available directly from the website and its worldwide distribution network. Maxon is part of the Nemetschek Group

Media Contact
Vicky Gray-Clark
Ambient PR
vicky@ambientpr.com | 408-318-1980