Collaboration par excellence

Example: Hasselt City Hall, Belgium — The building of the new municipal administration center in Hasselt, Belgium, demonstrates how seamless collaboration in building projects can minimize risks and save costs from the design phase all the way to commissioning.
A joint project of several brands of the Nemetschek Group.
Nemetschek brands involved: Allplan, GRAPHISOFT, Solibri

Pioneering planning and project execution with Open BIM

“The end-to-end use of BIM solutions constitutes genuine added value for all stakeholders in the building process
because it enables seamless and efficient collboration”

Steven Hendrickx, Head Architect in Hasselt

Large-scale, highly complex building projects in particular require ongoing, reliable and efficient coodination between all stakeholders – both internal and external – across disciplines and between companies. Therefore, in association with other market players, the Nemetschek Group is promoting the Open BIM data standard. This is a universal, collaborative approach to designing, constructing and operating buildings based on open standards and workflows It makes it possible for project stakeholders to collaborate, even if the type of software varies from user to user. The Industry Foundation Classes (IFC) interface has established itself as an open standard and is therefore of central significance.

Sharing and evaluating data throughout the entire product life cycle saves time and money and improves quality. The administration of data is key to this digital transformation, for it is only possible to take full advantage of the potential if each stakeholder can access the data that he or she needs at any given time. This begins with a realistic BIM building model, which is an essential prerequisite for a genuine 5D workflo. This model is no longer limited to just 3D construction data; it also includes data concerning the dimensions of time and costs.

Seamless collaboration exemplified by the Hasselt City Hall

Under the management of the architect team comprising Jaspers-Eyers, MASS Architects and Michel Janssen, a new municipal administration center is being built in Hasselt. The complex, consisting of a renovated building section and a new building, provides approx. 17,000 m2 for the city administration and social services as well as offices. The architects and their most important partners are using Open BIM software solutions for the entire construction process. Three Nemetschek solutions are being implemented for this project: Archicad from Graphisoft for the design and planning of the architects, Allplan Engineering for civil engineering, and the Solibri Model Checker for the BIM quality control carried out by the construction company.

From the beginning, all information concerning the building project is contained in the digital building model – from the draft to implementation – including all design details, desired materials, fire protection requirements, acoustic properties, insulation and building structures, and administration. This constitutes considerable added value for all stakeholders compared to the old standard model, which was purely 3D. Thus, this improvement ensures more than just seamless collaboration between all those involved. The complex project can be turned over to the municipality – the proud building owner – with the required quality, on time and within the specified budget.

Hasselt City Hall is groundbreaking – in terms of design, planning and project implementation.

Independent and yet consistent

Steven Hendrickx, the head architect in Hasselt, recognized four decisive factors with Open BIM over the course of the successful project:

  • Individual partners design their model with their preferred BIM software, and with their own templates. Outstanding collaboration is ensured, though, thanks to a common, uniform standard which is specified in advance.
  • The division of labor is defined at the beginning of the project. Data on statics, for instance, have an essential impact on the architecture and structural design. Data on heating, ventilation and air-conditioning, on the other hand, are also important but don’t generally flow directly into the architecture. These data, for example, can be sufficiently analyzed with the BIM solution for quality assurance from Solibri.
  • Design changes in one area don’t necessarily affect the plans of all the others involved in the project. The architecture and the building stage are inherently the most closely linked.
  • The expertise of the staff, i.e., extensive holistic knowledge of the various building disciplines, is also critical for the success of the project.

Two examples of the advantage of precise planning

In Hasselt, the construction company was commissioned with excavation, among other tasks. An assessment of the amount of sand that needed to be removed was done based on a cal culation using conventional 2D planning methods, which yielded a result of 800 cubic meters. The engineers used the Solibri Model Checker based on Open BIM and the data provided by the architects and arrived at a figue that was just half this amount, i.e., 400 cubic meters of sand. This shows how exact the work with Open BIM solutions can be.

The steel struts to be installed are another example: With the interface function IFC Exports from Allplan, it was possible to use the BIM model to automatically calculate which steel struts needed fieproofing. All it took was a mouse click to obtain precise results, right down to the running meter. In projects that don’t use Open BIM solutions, these calculations are made by manually entering the data from 2D drawings in Excel or some other software and then recalculating and evaluating the data for use in quotations and planning, a process that is susceptible to error and one that leaves a lot of room for interpretation. These errors often go undetected until the actual cost planning is already completed. In the case of the Hasselt City Hall,  it was possible to avoid such errors from the outset.

Converting to Open BIM pays off

As is the case with any change, it takes a certain amount of time for companies and employees to accept BIM as the norm. The best way, according to Steven Hendrickx, is to start out by planning smaller projects using BIM. The experience thereby gained will make it possible to complete successively larger BIM projects. The advantages of collaborating through Open BIM are obvious: The entire workflow is much simpler for all project stakeholders, and building projects are completed within time and cost budgets.

CONCLUSION

Consistent standards and open interfaces in par-ticular are essential for successful building projects. Stakeholders need solutions that can “work together” for all and any individual tasks being performed. Seamless collaboration between humans and machines: This is ensured with Open BIM, and backed by the brands of the Nemetschek Group.



Reference projects on this topic:

Umsetzung des größten europäischen Bauprojekts mit Software von NEVARIS (german)

Teilabschnitt des Brenner Basis Tunnels wird mit NEVARIS BUILD geplant

Bremen, 30. Juli 2019 – Seit dem Spätherbst 2018 laufen die Bauarbeiten am etwa 18 Kilometer langen Baulos ‚Pfons-Brenner‘, dem größten österreichischen Teilabschnitt des Brenner Basistunnels – der künftig längsten unterirdischen Eisenbahnverbindung der Welt. Dieses Tunnelbauprojekt führt ein Konsortium um die PORR AG im Auftrag der BBT ARGE aus und setzt für eine effektive bautechnische Umsetzung die Software-Lösung NEVARIS BUILD ein.

„Wir sind sehr stolz darauf, dass dieses Jahrhundertbauprojekt mit unserer Software verwirklicht wird“, betont Daniel Csillag, Geschäftsführer bei Nevaris und ergänzt: „Neben der Anwenderfreundlichkeit und Ausrichtung auf einen effizienten Bauprozess erfüllt NEVARIS BUILD zudem die Anforderungen des aktuellen österreichischen Normenkatalogs (ÖNORM).“ Ein weiterer Vorteil: Im Hinblick auf das hohe Datenvolumen und die Informationskomplexität weist die Software darüber hinaus eine hohe Leistungsfähigkeit auf. Die durchgängige und prozessorientierte Anwendung ist sowohl für Planer und ausschreibende Stellen als auch für bauausführende Unternehmen geeignet. Mithilfe der Software bilden die Bauausführenden die Bereiche Kalkulation, Nachunternehmermanagement, Baurechnung und -zeitplanung von der Angebotserstellung bis hin zur Schlussrechnung vollständig ab. Csillag ergänzt: „Wir freuen uns, dass wir abermals mit unserer Lösung überzeugen konnten, die den konventionellen Angeboten am Markt in Funktion sowie Bedienung weit voraus ist. NEVARIS BUILD ist hochinnovativ und perfekt auf die Belange von Bauunternehmen ausgerichtet.“

Anspruchsvolles Bauprojekt
Im Rahmen des sogenannten Bauabschnitts Pfons-Brenner errichtet das Konsortium zwei Haupttunnelröhren zwischen Pfons und Brenner, einen rund neun Kilometer langen Erkundungsstollen und die Nothalte- und Überleitstelle bei St. Jodok. Dafür ist eine Bauzeit von 74 Monaten vorgesehen. Das Auftragsvolumen umfasst rund eine Milliarde Euro.

Aufgrund der geologischen Voraussetzungen und beengten Platzverhältnisse ist das Bauprojekt mit immensen Herausforderungen verbunden und erfordert eine detaillierte Planung und kostenoptimierte Umsetzung, die über die Software abgedeckt werden. Die beiden eingleisigen Haupttunnelröhren entstehen vorrangig mit Tunnelbohrmaschinen, die einen Ausbruchdurchmesser von 10,37 Metern besitzen. Auf diese Weise kann pro Tag und pro Maschine eine Strecke von bis zu 30 Metern realisiert werden. Der Ausbruch des geplanten Erkundungsstollens erfolgt durch Sprengvortrieb mit Spritzbetonsicherung. Die komplette Versorgung wird über einen einzigen Zugangsstollen realisiert.

Weitere Informationen finden Sie auch unter www.nevaris.com.

Pressekontakt:
Ariane C. Redder
Head of Marketing
Tel.: +49 (421) 59660-325
E-Mail: redder@nevaris.com

 

Über die NEVARIS Bausoftware GmbH
Das Unternehmen entwickelt und vertreibt ganzheitliche Software für die Bereiche Finance (kaufmännischer Bereich), Build (technischer Baubetrieb), BIM (Building Information Modeling) sowie mit 123erfasst mobiles Baustellenmanagement mit Zeiterfassung und Projektdokumentation über eine App. NEVARIS deckt den kompletten Bedarf einer leistungsfähigen Software für das Bauhaupt- und Baunebengewerbe ab.
Der deutsche Firmensitz ist in Bremen. Weitere Niederlassungen befinden sich in Berlin, Herne, Karlsruhe, Leipzig, Lohne und München. In Österreich ist die NEVARIS Bausoftware GmbH in Salzburg ansässig. Im deutschsprachigen Raum beschäftigt die Firma rund 180 Mitarbeiter. Starke Marken wie Microsoft oder DocuWare sind langjährige Partner der NEVARIS. Seit den 90er Jahren gehört das Softwareunternehmen zur weltweit agierenden Nemetschek Group.

Über die NEMETSCHEK Group
Die Nemetschek Group ist Vorreiter für die digitale Transformation in der AEC-Industrie. Als weltweit einzige Unternehmensgruppe deckt Nemetschek den kompletten Lebenszyklus von Bau- und Infrastrukturprojekten ab und führt ihre Kunden in die Zukunft der Digitalisierung. Mit intelligenten und innovativen Softwarelösungen erhöht die Nemetschek Group die Qualität im Bauprozess und verbessert den Workflow und die Zusammenarbeit aller am Bauprozess Beteiligten. Dank der einzigartigen Holding-Struktur der Nemetschek Group treiben die 16 starken Marken Innovationen voran und arbeiten eng mit ihren weltweit 4,0 Millionen Kunden zusammen. Gegründet von Prof. Georg Nemetschek im Jahre 1963, beschäftigt die Nemetschek Group heute mehr als 2.500 Experten. Das seit 1999 börsengelistete und im MDAX und TecDAX notierte Unternehmen erzielte 2018 einen vorläufigen Umsatz in Höhe von 461 Mio. Euro und ein EBITDA von 121 Mio. Euro.